Eng. Samson Chereret

Eng. Samson Chereret Impacting communities to sustainable development.

30/11/2024
03/08/2024
Sustainable innovation for future housing project at fremantle area of Perth, Western Australia. The entire project was ...
28/07/2024

Sustainable innovation for future housing project at fremantle area of Perth, Western Australia. The entire project was completed in a record time of one year. Brick laying work done by EMCG PTY.
All components are renewable, energy included. This is an emerging trend in engineering that will shape the future and save the planet from the damage already done by us.

Building a Legacy.
15/07/2024

Building a Legacy.

22/06/2024

Installation and pumping of concrete at Baldivis police station Western Australia. Exciting experience to learn how same things can the done in a different way with the help of sophisticated technologies.

Thumb rules when on site.
25/08/2022

Thumb rules when on site.

15/02/2022
Kenha South Rift Family Performance Contract/Team building Review session in Burch Resort Naivasha. A special way for st...
24/01/2022

Kenha South Rift Family Performance Contract/Team building Review session in Burch Resort Naivasha. A special way for starting the year 2022.

A case study of Nyamira County Assembly building that collapsed. For engineering projects we use a Reasonable Care Model...
01/06/2021

A case study of Nyamira County Assembly building that collapsed.

For engineering projects we use a Reasonable Care Model of Professional Responsibility (RCMPR) to determine if it’s the engineer who is responsible of the damage made.

A person,S, is responsible for the harm he/she causes when his/her contacts fits the following pattern,

1. As a member of a profession ,S has a duty to conform to the standard operating procedures of his or her profession, unless those standards are lower than those that a non-professional will adopt in a given situation, in which case a, S has a duty to conform to the higher standards.

2. At time, T, action ,X, conforms to the standard of reasonable care of 1 above.

3. S, omits to perform action X at time T.

4. There is evidence that harm is caused to some person or persons as a result of person S failure to do X.

Real Time Kinematics (RTK), embracing technology in engineering survey.  It’s reliable & effective in road works, Railwa...
16/02/2021

Real Time Kinematics (RTK), embracing technology in engineering survey. It’s reliable & effective in road works, Railways & cadastral works. Advisable for contractors to adopt, it’s saves time and very economical.

Address

Perth
Western

Telephone

+254700841220

Website

Alerts

Be the first to know and let us send you an email when Eng. Samson Chereret posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Eng. Samson Chereret:

Share