11/11/2025
π INTERIOR PROGRESS π
Today was one of those days where it really felt the interior was taking shape. After purchasing some wall felt and a couple of cans of spray glue, it was straight to work to start fitting it to walls and the ceiling. Although not properly finished off yet, it makes the interior look so much better! Adding to that, a piece of trunking was fitted between the toilet and the wall to enclose all cables hanging between the cab and the studio area.
After that, it was onto removing the dado trunking from the wall in the recording area to give us a flat wall. The gap between the felt will be filled in with scraps of the new felt.
Lastly, it was onto filling in the gaps on the floor where previous fixings had been removed and other bits like the bench moving closer to the cab. The cut out pieces of heavy duty flooring were glued down onto the wooden floor with wooden battens screwed down to ensure it gets the best possible chance of sticking.