17/06/2026
The SRC leadership officially handed over several projects and items to campus management in the presence of the Principal, Head of Audit, Head of IT, and the Works and Physical Development (WPD) Unit as part of our commitment to improving student welfare and campus infrastructure.
1. A Complete Base Sound System and Amplifier
2. Purchased and installed 30 Streetlights to enhance visibility, a safer brighter space and security on campus
3. Four (4) One-Room Canopies and One (1) Two-Room Canopy
4. A Backdrop For The School’s Main Auditorium
5. A Water Supply Outlet with a 10,000L Poly Tank
6. A Tricycle To Enhance Water Distribution
7. GHS 22,000 support to management for the procurement of CCTV Cameras to strengthen campus security
8. Installation of Wi-Fi at the Main Auditorium, Great Hall A, B & C, the SRC Secretariat, and the school Library. The DAAD Block is secured.
9. Initiation and Implementation of the SRC Support Funds. Supported 20 students with their school fees and 25 students with provision supports.
10. Metal Tent at the SRC Secretatriate to serve as sitting shade during registrations of students.
11. We proudly offered free NHIS registration and renewal to all students.
These interventions demonstrate the SRC’s commitment to improving the academic environment, strengthening security, and supporting students in need.
Indeed We Came To Serve And We've Delivered.
Leadership of Service.
/2026
-FuseiniLedAdministration