Ecc Infra Pvt Ltd

Ecc Infra Pvt Ltd Free of cost "Microsoft Project" upcoming training session at our YouTube channel - https://youtube.com/

27/09/2024

/ for an Infrastructure Road Project by in the State of Andhra Pradesh.

Name of Project- Widening of Kondamodu to Perecherla Section Design Ch. Km 0.00 to Km 49.917 of NH 167AG to 4 Lane with paved shoulder Configuration on EPC Mode.

NIT Cost-699.02 Cr.

Rajendra Singh Bhamboo 556.88 Cr. L-1
IJM (INDIA) INFRASTRUCTURE 573.00 Cr.
Renaatus Projects Private 599.99 Cr.
BHARAT VANIJYA EASTERN 685.00 Cr.
K.C.V.R INFRA PROJECTS 767.59 Cr.
BVSR CONSTRUCTIONS 768.64 Cr.
M/s. Ashoka Buildcon Ltd 777.03 Cr.
RITHWIK PROJECTS 782.13 Cr.
KNR CONSTRUCTIONS 797.94 Cr.

 /    for an Infrastructure Road Project by
24/09/2024

/ for an Infrastructure Road Project by


23/09/2024

/ for an Infrastructure Project by
Project Name- Design and Construction of an elevated metro viaduct spanning 17.624 km, including 79m and 100m railway spans, as well as a six-lane double-decker portion with a vehicular underpass (VUP) stretching 1.14 km of the Reach-1A section of the NMRP Phase-2

Ex*****on Mode:-EPC (Engineering, Procurement & Construction)
NIT Cost- 945.00 Cr.

1. GR Infra. 904.00 Cr. (L-1)
2. KPIL Const. 959.01 Cr.
3. Dilip Buildcon 978.45 Cr.
4. NCC Itd. 1115.08 Cr.
5. Tata Projects. 1147.10 Cr.



22/09/2024

Free of Cost "Microsoft Project" Training program for All Engineering Professionals & Students from 7th Jan 2025 onwards (weekends).
Why join us:-
1-100% Free Training Programs
2-Industry-relevant skills in Infrastructure, Construction, and Engineering.
3-Hands-on experience with real-world projects.
4-Live Sessions on YouTube – Accessible to everyone, anytime!
🎥 Available Live on Our YouTube Channel https://youtube.com/
Learn the most sought-after project management tool and enhance your career prospects.

Free of cost "Microsoft Project" upcoming training session at our YouTube channel - https://youtube.com/

22/09/2024

वृक्षारोपण से न केवल पर्यावरण संरक्षण होता है, बल्कि यह भविष्य की पीढ़ियों के लिए एक सुरक्षित और हरा-भरा वातावरण प्रदान करता है। इसलिए, अधिक से अधिक पेड़ लगाना और उनका संरक्षण करना हमारी प्राथमिकता होनी चाहिए।

22/09/2024

Tender/Bid Results for an Infrastructure Project by MSIDC (Maharashtra State Infrastructure Development Corporation).

Project Name- Pardi Sarwadi Chincholi Selgaon Umari Saval Ajandoh Kannamwargram Road MDR-06 Km 3/600 to 36/300 Tal. Karanja Dist. Wardha (Actual Length 32.700 Km) on EPC mode.
Location- Tal. Karanja Dist. Wardha (Maharashtra)
Ex*****on Mode :-EPC (Engineering, Procurement, and Construction).
NIT Cost- 100.59 Cr.
1- INFRATECH CONSTRUCTION 109.99 Cr. L-1
2- ARCONS INFRASTRUCTURES 115.15 Cr.


21/09/2024

Tender/Bid Results for an Infrastructure Project by MSIDC (Maharashtra State Infrastructure Development Corporation)

Project Name- Viahad Nifandra Gangalwadi Bramhapuri Armory Connecting Road NH-353D MDR-29 Km 0/00 to Km 39/500, State Highway No.375 Km 31/800 to Km 33/900, State Highway No.322 Km 182/200 to Km 188 /100 Tal. Bramhapuri, Dist.Chandrapur on EPC mode.
Location- Tal. Bramhapuri, Dist.Chandrapur (Maharashtra)
Ex*****on Mode :-EPC (Engineering, Procurement, and Construction).
NIT Cost- 200.34 Cr.
1- Dineshchandra R Agrawal 246.50 Cr. L-1
2- Eagle Infra India Ltd 246.92 Cr.

18/09/2024


Project Name- Amalner Nagad Kannad -Devgaon-Lasur-Gangapur to Kaigaon Tok road SH - 39 Km 119/300 Tal. Gangpur Dist. Aurangabad.
NIT Cost- 229.86 Cr.
1- AGC INFRACON PRIVATE 241.13 Cr. L-1
2- A. C. Shaikh Contractor 248.99 Cr.

17/09/2024


Name of Project:-Construction of 4/6 Lane Northern Ayodhya Bypass tot length 35.40 kms Part1 north of NH27 from 0.000 to 30.400 (Starting near 112.540 ending at 139.928 of NH27) and Part2 south of NH27 from 0.000 to 5.000 on HAM under NHDP Ph7 in Uttar Pradesh
NIT Cost-1386.51 Cr.
1-CEIGALL INDIA LIMITED 1199.30 Cr. (L-1)
2-KCC Buildcon Private Limited 1288.00 Cr.
3-MKC Infrastructure Ltd 1334.96 Cr.
4-HG Infra Engineering Limited 1366.11 Cr.
5-IJM CORPORATION BERHAD 1404.00 Cr.
6-Dilip Buildcon Limited 1422.00 Cr.
7-Dineshchandra R Agrawal 1467.00 Cr.
8-CDS INFRA PROJECTS LIMITED 1468.00 Cr.
9-PNC Infratech Ltd 1521.00 Cr.
10-Gawar Construction Limited 1527.13 Cr.
11-APCO Infratech Pvt Ltd 1582.00 Cr.
12-Adani Enterprises Ltd 1592.55 Cr.
13-Oriental Structural 1666.50 Cr.
14-G R Infraprojects Limited 1725.07 Cr.
15-Vishwa Samudra Engineering 1773.00 Cr.

17/09/2024


Project Name-: 4/6 lane Southern Ayodhya bypass from km. 5.000 to km. 37.172 (starting near km. 112.540, ending at km. 153.281 of nh27) of total length of 32.172 km. On ham basis under NHDP PH-vii in the state of Uttar Pradesh

NIT Cost: 1425.44 crore
1- Ceigall India Limited - 1299.20 cr. (L-1)
2- Kcc Buildcon Private Limited- 1421.0 cr.
3- Mkc Infrastructure Ltd- 1433.91 cr.
4- HG Infra Engineering Limited- 1483.11 cr.
5- IIM Corporation Berhad- 1497.0 cr.
6- Oriental Structural Engineers- 1555.78 cr.
7- Dineshchandra R. Agrawal- 1584.0 cr.
8- Gawar Construction Limited- 1598.22 cr.
9- Cds infra projects limited 1630.58 cr.
10- Adani Enterprises Ltd- 1633.48 cr.
11- Rail Vikas Nigam limited- 1665.40 cr.
12- Apco Infratech Pvt ltd- 1675.0 cr.
13- GR Infraprojects limited- 1797.97 cr.
14- Vishwa Samudra engineering- 1818.00 cr.
15- Shivalaya Construction- 1835.0 cr.

Address

Delhi

Opening Hours

Monday 8am - 5pm
Tuesday 8am - 5pm
Wednesday 8am - 5pm
Thursday 8am - 5pm
Friday 8am - 5pm

Website

Alerts

Be the first to know and let us send you an email when Ecc Infra Pvt Ltd posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share