07/03/2026
10th floor slab formwork  gradually in progress
07/03/2026

10th floor slab formwork gradually in progress

10th floor deck form work on 350mm tk drop cap panel in progress
07/03/2026

10th floor deck form work on 350mm tk drop cap panel in progress

Concrete placement on types 1 service staircase from 5th to 6th floor complete 💯✅
25/02/2026

Concrete placement on types 1 service staircase from 5th to 6th floor complete 💯✅

Twinlift coreWall 1,2,3 form work from 4.2m to  5.35m still in progress
25/02/2026

Twinlift coreWall 1,2,3 form work from 4.2m to 5.35m still in progress