Khash Kura News

Khash Kura News Welcome to KhashKura News. Follow today to stay updated with truthful news.

Here, you will get the latest news, politics, public voices, viral updates, and special reports from Nepal and around the world in a fast, truthful, and reliable way.

14,500 children have no school. Not because the buildings fell — because the buildings are full of people who have nowhe...
18/09/2026

14,500 children have no school. Not because the buildings fell — because the buildings are full of people who have nowhere else to sleep.

That's the quiet crisis inside the flood. A government assessment — conducted by the education ministry with federal and provincial officials and teams from UNICEF and Save the Children — finds schooling disrupted for more than 14,500 children across 63 institutions in Rasuwa, Nuwakot and Dhading. Of those, 9,430 are directly affected: they've lost a parent, a home or a school.

Here's the part that isn't about broken concrete. 28 of the 29 temporary holding centres in the three districts are running inside school buildings — 22 in Nuwakot, six in Rasuwa — sheltering about 2,000 displaced people. So even schools that survived can't reopen: the classroom is now someone's bedroom. It's a brutal trade-off with no clean answer.

The human toll behind the numbers: at least 100 children have lost both parents. Nearly 500 enrolled students are still unaccounted for. 1,372 have been displaced. Among teachers and staff, 24 are missing and two are dead — and officials expect these figures to rise.

Some individual schools tell the whole story. Nepal Rastriya Basic School in Timure was destroyed — of its 35 students, 25 remain unaccounted for, along with 6 of its 11 teachers. Bidur municipality in Nuwakot was hit hardest, with more than 3,000 students affected and 227 students and 11 teachers listed missing. The historic Tribhuvan Trishuli Secondary School is gone.

The physical damage: 268 classrooms across 45 buildings, 82 toilets and 20 water sources destroyed, plus 3,232 textbooks, 4,561 desks and benches, 194 computers and 144 laptops.

And here's the policy angle worth pausing on — the assessment's own teams recommend getting children back to learning first, rather than rushing to rebuild. So far 13 of a planned 68 temporary learning centres are up (30 students each). Bagmati province is arranging residential schooling for the newly parentless — 200 students at Chhetratrapal Secondary in Likhu, Nuwakot, and 250 at Nilkantha Secondary in Uttargaya, Rasuwa — alongside the education ministry's new Scholarship Bank.

Learning before bricks. For a child who has lost everything, a functioning classroom is not the last thing to restore. It may be the first thing that feels normal again.

📄 Source: The Kathmandu Post, "Bhotekoshi floods disrupt schooling for 14,500 children in three districts" (Sep 18, 2026), citing the education ministry's assessment with UNICEF and Save the Children.

The world's biggest YouTuber was supposed to be filming in Nepal right now. He's fundraising for it instead.Jimmy Donald...
18/09/2026

The world's biggest YouTuber was supposed to be filming in Nepal right now. He's fundraising for it instead.

Jimmy Donaldson — MrBeast, 517 million+ subscribers — had planned to shoot a video in Nepal a few weeks ago. The August 26 flood put that on hold. Instead, he and his charity Beast Philanthropy have partnered with the humanitarian organization CARE to raise funds for survivors, and he recorded a direct-to-camera appeal for his platforms asking his audience to give.

The goal is concrete, not vague: reach more than 10,000 people with food, water and shelter — including up to 1,500 of CARE's "CARE PACKAGE® for Emergencies" kits and transitional shelter for 100 families. Each kit is built for a family of four for a month and bundles five needs in one — a shelter kit (fireproof tarps, ropes), a wash/hygiene kit, a kitchen kit (pots, portable stove), a dignity kit (sanitary pads, undergarments) and an energy kit (solar charger, emergency light). CARE says the campaign, with partners including P&G, has already raised $1 million.

Mona Sherpa, CARE Nepal's country director, put the small things plainly: "A solar light can mean a woman can safely walk to the washroom at night, while dignity items can meet needs that people may not feel able to ask for. A tarpaulin can give a family a temporary space of their own while they consider what comes next."

And here's the point — this isn't one celebrity, it's a pattern of outside money finally arriving. Nvidia has pledged $10 million (it employs around 50 Nepalis). Kathmandu University has committed Rs 8.5 million. MrBeast's reach just puts a familiar door on a story much of the world has scrolled past for three weeks.

One thing before you give: donate only through the official partnership channel on care.org. Flood-relief scams have already drawn 72 takedown orders from Nepal's Press Council — so if a link isn't CARE's or Beast Philanthropy's own, don't touch it.

Where things stand (NDRRMA): 1.6 million people affected, 1,386 dead, 5,130 still missing.

📄 Sources: CARE (care.org, Sep 15); Onlinekhabar; Times of India. Subscriber count: MrBeast's YouTube channel.

About 188 engineers and technicians are still missing. Some of their families have already held funerals — with effigies...
18/09/2026

About 188 engineers and technicians are still missing. Some of their families have already held funerals — with effigies made of grass, because there is no body to burn.

Twenty-two days after the flood, the Nepal Engineers' Association is still trying to account for its own. Around 900 workers from roughly a dozen hydropower projects along the Bhotekoshi and Trishuli remain unaccounted for, and about 188 of them are engineers and technicians — the people who were on site keeping the plants running when the water came down. Only two hydropower workers have been pulled out alive, one of them Sanjay Sah, rescued from the Trishuli 3A tunnel after nine days.

These are not statistics to the families. Across the country, relatives have performed funeral rites without bodies — cremating kusha-grass effigies in place of the missing, because Nepal's forensic teams have identified only a fraction of the recovered dead and the rest are somewhere under the mud, or gone entirely. Grief, and no grave.

There is an accountability question underneath this, and it is a fair one to ask out loud. At several of these projects, camps and powerhouses sat close to the river — in some cases rebuilt near the water after last year's flood had already forced workers to flee into the forest to survive. Families of the missing have questioned why crews were housed and working that close to a river that had shown, only a year earlier, exactly what it could do.

And the damage outlasts this disaster. The Engineers' Association warns that colleagues are now afraid to go into the field, that mental stress among survivors is rising, and that the expertise lost here — a generation of hydropower engineers — takes years to rebuild.

Where things stand (NDRRMA): 1,386 dead, 5,130 still missing, only 104 identified and returned.

📄 Sources: Nepal Engineers' Association (~188 engineers/technicians missing); The Kathmandu Post (effigy funerals, Sep 3); Reuters (tunnel rescues); NDRRMA (toll). Family-specific details pending confirmation against the published feature.

16/09/2026

बाढीपीडितलाई राहत! अस्थायी आवास र सिकाइ केन्द्रबारे सरकारको ठूलो निर्णय Balen Rastriya Swatantra Party - RSP Sasmit Pokharel Supporters✅

16/09/2026

रास्वपाभित्र आफ्नै सरकारको आलोचना किन? रविको यस्तो जवाफ! Balen Rastriya Swatantra Party - RSP Khash Kura News

16/09/2026

भोटेकोशी बाढीपछि सरकार ‘युद्धस्तरमा’ काम गर्दैछ : रवि लामिछाने Rastriya Swatantra Party - RSP Balen Khash Kura News

Two homecomings to close the day — one for the dead, one for the living.Samba is a Labrador, about a year and a half old...
15/09/2026

Two homecomings to close the day — one for the dead, one for the living.

Samba is a Labrador, about a year and a half old, brought to Nepal from India and trained to detect the scent of human remains. He's part of the Armed Police Force's K-9 unit, working the flood zone since August 26. When he catches a scent beneath the ground he slows, fixes on a spot, sits or scratches at the earth — and his handlers start digging.

Since the flood, Samba has helped locate around 20 bodies, in the Trishuli area and at Timure in Rasuwa. Read that number the way it deserves to be read: that's roughly twenty families who get to bury someone, instead of waiting by a river that gives nothing back. (Samba is one of five APF dogs on the ground; Nepal Police have deployed six more, and the Army has its own.)

Sanjay Sah has gone home. He is the man who walked out of the Trishuli 3A tunnel alive after nine days underground. He says it was prayer, hope, and thoughts of his family that carried him through the dark, the hunger and his injuries. He's been discharged. His village is still mourning the workers who never came out — so his survival is joy and grief in the same breath.

And a few more lifts from a hard week:

• Elephants in the Fog, Abinash Bikram Shah's Cannes Jury Prize–winning feature, is Nepal's official submission to the 99th Academy Awards — and the PM has congratulated the team. The film is holding a special screening in France, with proceeds going to the PM's Disaster Relief Fund. • Miss Nepal Deepmala Dhakal reached Dhunche in Rasuwa with relief supplies, distributing to around 150 flood-affected households alongside the NRNA. • Nepal has named its team for the 20th Asian Games in Aichi-Nagoya — 135 athletes across 21 sports in a 211-member delegation, including a 15-member men's cricket squad fresh off Asia Cup qualification.

Where things stand (NDRRMA): 1,386 dead, 5,130 still missing, only 104 identified and returned. Damage now exceeds Rs 408 billion; reconstruction is estimated at around Rs 712 billion — NDRRMA has revised this down slightly from the Rs 723 billion figure circulating earlier, so this is the current number.

Nineteen days in, this is what carrying on looks like: a dog with a good nose, a man who came home, and a country that still went out and won a cricket final.

📄 Sources: The Kathmandu Post / AsiaNews Network (Samba, Sep 14); Onlinekhabar (Elephants in the Fog; Deepmala); Reuters (Sanjay Sah); NDRRMA (toll & damage figures).

15/09/2026

ICU मै बिरामीको अन्तर्वार्ता? सांसद समीक्षा बाँस्कोटाको गम्भीर आपत्ति Balen Rastriya Swatantra Party - RSP Khash Kura News

15/09/2026

बाढीपीडितको मानसिक स्वास्थ्यमा सरकार गम्भीर बनोस् : इन्दिरा राना मगर Balen Rastriya Swatantra Party - RSP Khash Kura News

2,792 metres. That's the combined length of the motorable bridges the flood completely erased.The number comes from the ...
15/09/2026

2,792 metres. That's the combined length of the motorable bridges the flood completely erased.

The number comes from the government's official assessment — the "Rasuwa-Bhotekoshi Flood 2083: Rapid Damage and Needs Assessment." Of 37 motorable bridges damaged, 33 were washed away entirely, totalling 2,792 metres of span. The breakdown:

• Nuwakot — 14 bridges, 1,480 m (about 40.5% of the total loss) • Dhading — 5 bridges, 613 m • Rasuwa — 13 bridges, but only 566 m (its bridges were shorter) • Gorkha — 1 bridge, 133 m

Four more suffered partial damage (240 m). And that's just the motorable bridges — the flood also hit 68 suspension bridges, 10,670 metres in all, which is why so many river crossings are simply gone.

Now the repair side, because there is real movement:

India has handed over the first consignment of a 70-metre Bailey bridge at Hetauda, headed straight to Nuwakot to restore the Betrawati crossing — the first of three bridges India is sending, with more consignments due in the coming days.

At Krishnabhir, vehicles crossed on Sunday in a trial run — eleven days after work began on the Prithvi Highway. Around 20 vehicles went through the temporary track, including a stranded gas tanker and heavy freight trucks. But this is a trial, not a reopening: regular traffic is still days off, and in the meantime diverted vehicles are overwhelming the narrow Tribhuvan Highway. The Department of Roads is racing to open a temporary track to the Chinese border before Dashain.

And a sharp counterpoint on whether the system can actually deliver: this week the Baitadi Road Division terminated contracts for 10 long-stalled road projects — maintenance and upgrades on the Mahakali, Jayaprithvi and Madhyapahadi highways among them — with blacklisting and deposit seizures now in motion. It's a reminder that the bottleneck in Nepal's roads isn't only rivers. It's ex*****on.

2,792 metres to rebuild. The Bailey bridges are a bridge in every sense — temporary spans to buy time. The permanent question is whether the rebuild moves faster than the last one did.

📄 Sources: Onlinekhabar, "Rasuwa flood washed away 2,792 meters of bridges" (Sep 14) citing the govt Rapid Damage & Needs Assessment; The Kathmandu Post (India Bailey bridges; Krishnabhir trial run, Sep 13); Onlinekhabar (Baitadi contracts).

Address

Jagannath Marg, Budhanilkantha 8
Kathmandu
44600

Website

Alerts

Be the first to know and let us send you an email when Khash Kura News posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share