Pinoy Joyride

Pinoy Joyride Welcome to Dmitri Valencia’s Pinoy Joyride page—featuring updates on roads, tollways, railways, and snapshots from the journey. Thank you.

Showcasing the nation’s infrastructure story—one road, one railway, one milestone at a time. This page is all about appreciating Philippine infrastructure projects. Appreciating roads and bridges, new developments on other infra projects. Road trip, Roads, Highways, Toll Road, Bridges, Railway, Construction works and skyscrapers

This page was created by the owner of dmitrivalencia channel on you

tube then he met good friends, followers of the same passion and he decided that they become fellow moderators too. Youtube page: www.youtube.com/dmitrivalencia

Enjoy the journey to progress! FB page established 2012

TRB OKs CAVITEX Toll Adjustment Effective October 28, 2025The Toll Regulatory Board has approved the toll rate petitions...
25/10/2025

TRB OKs CAVITEX Toll Adjustment Effective October 28, 2025

The Toll Regulatory Board has approved the toll rate petitions of CIC and PRA (filed in 2020 & 2023) for the Manila–Cavite Expressway.

To cushion the impact, CAVITEX will reactivate the Abante Program, allowing registered PUVs and agri trucks to continue paying old rates for 90 days.

New Toll Rates (VAT-inclusive)
CAVITEX R1 – Seaside to Zapote
• Class 1 — ₱39
• Class 2 — ₱78
• Class 3 — ₱117

R1 Extension Segment 4 – Zapote to Kawit (1st tranche)
• Class 1 — ₱88
• Class 2 — ₱176
• Class 3 — ₱264

Other Adjustments
• Sucat Interchange rates will also be updated
• CAVITEX C5 Link Segment 2 new rates: ₱38 / ₱76 / ₱114

Completed and ongoing upgrades include bridge joint replacements, RFID/ALPR enhancements, and pavement rehabilitation.

A new update for CALAX and CCLINK is now premiering on YouTube at 10:30 AM, today.The video covers the latest field obse...
24/10/2025

A new update for CALAX and CCLINK is now premiering on YouTube at 10:30 AM, today.

The video covers the latest field observations along the alignment, including developments recorded over the past weeks and activity in areas approaching the remaining subsections.

📺 Watch the premiere here:

This video presents the latest construction status along selected sections of the CALAX alignment as observed during the recent site visit. Multiple works co...

“Governor’s Dr — Exit 500m” signage sa CALAX Subsection 3.Subtle additions like this are signs that the alignment is pro...
23/10/2025

“Governor’s Dr — Exit 500m” signage sa CALAX Subsection 3.

Subtle additions like this are signs that the alignment is progressing. There is still work ahead and with luck, nature will cooperate as progress continues.

𝐏𝐄𝐄𝐊𝐀𝐁𝐎𝐎!🫣Throwback Thursday, as if it was revealing itself and for the first time after a hiatus last 2024, the   train...
23/10/2025

𝐏𝐄𝐄𝐊𝐀𝐁𝐎𝐎!🫣

Throwback Thursday, as if it was revealing itself and for the first time after a hiatus last 2024, the trainsets formally restarted their deployment to the mainline from their depot for test run, SIX MONTHS AGO!

Full of excitement despite the intense heat, we patiently waited for their return while still being pushed by the red UNIMOG. To date, the rolling stocks are gradually being tested, patiently waiting for welcoming their passengers in the coming years. Truly, it was Trainset 1's milestone for the entire project.


This is the view from one of the sections of CALAX Subsection 3 as it will appear once opened to motorists.Long stretche...
22/10/2025

This is the view from one of the sections of CALAX Subsection 3 as it will appear once opened to motorists.

Long stretches of cut sections and wide open plains define this part of the alignment, offering a clear perspective of the route motorists will eventually pass through.

Once operational, this segment will serve as a vital link across Cavite, improving travel time and accessibility between key areas in the province.

Calax Subsection 3 - km 23

Hope car makers bring back classic styling like this. Timeless ang dating. Ang pogi!
22/10/2025

Hope car makers bring back classic styling like this. Timeless ang dating.

Ang pogi!

May balak kayo subukan ang "One Rfid All Tollways" program ? Palagay sa comment ang experience ah 🙂
21/10/2025

May balak kayo subukan ang "One Rfid All Tollways" program ?

Palagay sa comment ang experience ah 🙂

ONE RFID, ALL EXPRESSWAYS!No more juggling multiple RFID accounts when driving through Luzon toll roads.The Department o...
21/10/2025

ONE RFID, ALL EXPRESSWAYS!

No more juggling multiple RFID accounts when driving through Luzon toll roads.

The Department of Transportation (DOTr) and the Toll Regulatory Board (TRB), in partnership with Autosweep and Easytrip, have officially rolled out the One RFID, All Tollways program — allowing motorists to use just one RFID account for all participating expressways.

How to enroll in 3 easy steps:

1️⃣ Opt-in online and select your preferred RFID provider.

2️⃣ Have the other RFID sticker removed at any authorized service center.

3️⃣ Top up your chosen RFID account and you’re good to go.

Dalawang train tonight sabay na test run! Maliwanag ang ilaw sa loob. Good evening.
20/10/2025

Dalawang train tonight sabay na test run! Maliwanag ang ilaw sa loob.

Good evening.




LOOK: Newly-opened Mezzanine Food Hall (L2) at NAIA Terminal 3.
20/10/2025

LOOK: Newly-opened Mezzanine Food Hall (L2) at NAIA Terminal 3.




𝗗𝗣𝗪𝗛: 𝗡𝗼 𝗿𝗶𝘃𝗮𝗹 𝗯𝗶𝗱𝘀 𝗳𝗼𝗿 𝗦𝗮𝗻 𝗠𝗶𝗴𝘂𝗲𝗹’𝘀 𝗽𝗿𝗼𝗽𝗼𝘀𝗲𝗱 𝗕𝗼𝗿𝗮𝗰𝗮𝘆 𝗯𝗿𝗶𝗱𝗴𝗲SAN MIGUEL Holdings Corp. (SMHC), the infrastructure arm of ...
20/10/2025

𝗗𝗣𝗪𝗛: 𝗡𝗼 𝗿𝗶𝘃𝗮𝗹 𝗯𝗶𝗱𝘀 𝗳𝗼𝗿 𝗦𝗮𝗻 𝗠𝗶𝗴𝘂𝗲𝗹’𝘀 𝗽𝗿𝗼𝗽𝗼𝘀𝗲𝗱 𝗕𝗼𝗿𝗮𝗰𝗮𝘆 𝗯𝗿𝗶𝗱𝗴𝗲

SAN MIGUEL Holdings Corp. (SMHC), the infrastructure arm of San Miguel Corp. (SMC), is poised to secure the ₱8.01-𝙗𝙞𝙡𝙡𝙞𝙤𝙣 𝙘𝙤𝙣𝙩𝙧𝙖𝙘𝙩 𝙛𝙤𝙧 𝙩𝙝𝙚 𝘽𝙤𝙧𝙖𝙘𝙖𝙮 𝙗𝙧𝙞𝙙𝙜𝙚 𝙥𝙧𝙤𝙟𝙚𝙘𝙩 after no competing bids were submitted, according to the Department of Public Works and Highways (DPWH).

“No other proposals came in by the deadline,” the DPWH communications team said in a Viber message to BusinessWorld over the weekend, citing information from the agency’s Office of Planning and Public-Private Partnership (PPP).

SMHC was granted original proponent status for the unsolicited project, which involves the financing, design, construction, operation, and maintenance of a 2.54-kilometer bridge system — including a 1.14-kilometer limited-access bridge — that will connect Caticlan in Malay, Aklan to Boracay Island.

The proposed bridge will feature public transport access, pedestrian lanes, bikeways, and provisions for utility lines such as power, telecommunications, water supply, and sewerage, according to the PPP Center.

https://www.bworldonline.com/corporate/2025/10/20/706539/no-rival-bids-for-san-miguels-proposed-boracay-bridge-says-dpwh/




Waterway Bridge 5 Girder Installation Now Fully Completed!The final three spans of Waterway Bridge 5 have officially bee...
19/10/2025

Waterway Bridge 5 Girder Installation Now Fully Completed!

The final three spans of Waterway Bridge 5 have officially been installed, marking the full completion of girder installation works. The lifting operations took place over a four-day period, from October 15 to 18, 2025, with Span 1, located above Mayor’s Drive, installed during nighttime to minimize traffic disruption.

Waterway Bridge 5 consists of six spans crossing the Ylang-Ylang River. The first three spans were successfully installed earlier in March 2025.

This bridge forms part of the Cavite–Laguna Expressway (CALAX) Subsection 2, a 9.79-kilometer stretch covering the segment from Governor’s Drive Interchange to Open Canal Interchange. A future interchange near Mayor’s Drive is also planned to further enhance accessibility along the route.

Congratulations to the lifting team for a successful and safe activity!
Weather cooperated!

Address

Makati

Alerts

Be the first to know and let us send you an email when Pinoy Joyride posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share