
17/07/2025
۔چینی کمپنی نے داسو ڈیم پر ٹریفک کے لیے پانچواں ٹنل۔بھی پہاڑ کے پار نکال لیا
the Dogah Tunnel (KKH01) of the Dasu Hydropower Project road realignment was successfully completed. With a length of 1,220 meters, it is the fifth tunnel of the project to be successfully completed.