7-point quality control checklist that every site supervisor should do before starting steel reinforcement work on a construction site in Pakistan.

Here’s the breakdown of the 7 checks the engineer explains:

*1. Level Marking* - First confirm the finished floor level from the drawings. This sets the correct slab height. The engineer shows how wall markings are used to transfer this level across the site.

*2. Beam Size* - Check the beam dimensions against the structural drawings. Example given: a beam labeled B7 should be 12 inches wide at the bottom with a 21-inch overall depth, leaving 15 inches of drop after subtracting the slab thickness.

*3. Grid Lines* - Make sure all beams are placed exactly on their grid locations. The engineer demonstrates using a string line between column points to verify alignment.

*4. Thickness & Level* - Measure the slab thickness at multiple spots using a measuring tape to ensure it’s uniform β€” in this case it should be 6 inches with a proper zero level.

*5. Escalator Opening* - Verify that structural openings like the one for the escalator match the exact size and position mentioned in the drawing.

*6. Shuttering Joint* - Inspect plywood shuttering joints and seal any gaps properly. If you don’t, concrete will leak and cause β€œhoneycombing,” which weakens the structure.

*7. Dusting & Oiling* - Once the first 6 checks are complete, clean the shuttering surface thoroughly and apply shuttering oil. This gives you a smooth concrete finish and makes de-shuttering easier without damaging corners.

The closing line: _Only after these 7 checks are done should you give permission for steel fixing._

It’s a quick, on-site guide aimed at contractors and civil engineering students to prevent common concrete defects and ensure structural accuracy.

14/10/2026

πŸ€” Main Bar Konsi Hai? Distribution Bar Konsi?
Slab ki steel mein Main Bar aur Distribution Bar ko pehchanna jante hain? πŸ—οΈ

Video dekhein aur batayein: Green wali bar aur Purple wali bar mein se Main Bar konsi hai? πŸ‘·β€β™‚οΈ

Follow for more Civil Engineering & Construction Site content.

Hashtags:

12/10/2026

How to Read a Steel Drawing? πŸ—οΈ

Slab reinforcement mein Main Bar aur Distribution Bar ka farq samajhna bohat zaroori hai. βœ…

Is video mein dekhein S1, S2 aur S3 cells ki drawing reading, Main Bar ki 5” c/c spacing aur Distribution Bar ki 7” c/c spacing. Saath hi, slab plywood par grid marking karne ka asaan tareeqa bhi seekhein.

Yaad rakhein: Main Bar shorter span par bottom mein hoti hai, jabke Distribution Bar longer span ki direction mein us ke upar lagti hai. Hamesha structural drawing aur engineer ki approval ke mutabiq kaam karein.

Follow for more Civil Engineering & Construction Site content. πŸ‘·β€β™‚οΈ

30/09/2026

Beam Shuttering & Stirrups Spacing Check on Site | Sariya Bandhne Se Pehle Ye Zaroor Dekhein

Construction site par slab shuttering aur beam tayyar karte waqt hone wali aam galtiyan aur unki sahi checking ka tareeqa janein!

Is video mein hum tafseel se baat kar rahe hain
- beam ke bottom mein column ki capping wali jga pr stirrups (rings) ki spacing aur aam ghaltiyan.
- Beam ka sariya dalne se pehle rings aur shuttering ko theek tarah check karna.
- Drawing ke mutabiq beam ki latak (depth) aur bottom ki paimaish confirm karna.

Aisi mazeed informative construction aur civil engineering videos dekhne ke liye channel ko subscribe karein, page ko follow karein aur video ko like zaroor karein!

✨

23/09/2026

Shuttering work mein slab aur beam ka bottom lagane se pehle column ki capping properly check karna bohat zaroori hai.
Agar capping theek na ho aur column ke sides se slurry bahar nikle, to concrete placement ke waqt honeycombing aur poor-quality surface ka risk barh sakta hai.
Is short mein dekhein Column Capping ka correct method aur shuttering se pehle kin points ko check karna chahiye. πŸ‘·β€β™‚οΈπŸ—οΈ
Civil Engineering | Construction Site | Shuttering

FacebookReels γ‚šviralγ‚·

23/09/2026

Waterproofing Fail Kyun Hoti Hai? Basement Ki 5 Bari Ghaltiyan!
πŸ“ YouTube Description
Basement waterproofing karne ke baad bhi leakage kyun hoti hai? πŸ€”
Is video mein basement ki external waterproofing system ko simple 2D construction animation ke through explain kiya gaya hai β€” including 4mm waterproofing membrane, water-seal chemical, protection board aur drainage layer/chips.
5 common mistakes jo waterproofing ko fail kar sakti hain: βœ… Poor surface preparation
βœ… Wrong waterproofing system
βœ… Joints/overlaps ki improper sealing
βœ… Protection layer na dena
βœ… Drainage ko ignore karna
Proper waterproofing sirf chemical lagane ka naam nahi β€” complete system aur proper detailing zaroori hai.

12/09/2026

Lab Mein Concrete Test Kaise Hota Hai? πŸ§ͺ | Part 1 | Concrete Testing Explained
Concrete ki lab testing mein exactly kya hota hai? 🧱πŸ§ͺ
Is Part 1 mein dekhein concrete testing ka basic process aur important tests.

Is series mein hum step-by-step cover karenge: βœ… Concrete Lab Testing
βœ… Slump Test
βœ… Cube & Cylinder Test
βœ… Compressive Strength
βœ… kN se PSI Conversion
βœ… Final Percentage Result

Part 2 & Part 3 mein complete calculation aur actual test result ko detail mein explain kiya jayega.

πŸ“Œ Follow Instagram:
πŸ“Œ YouTube: Engrumarfaruk


06/09/2026

30/08/2026

Rooftop Slab Cement Calculation | 20Γ—40 ft | 6" Slab | M20 Concrete

Description:
20Γ—40 ft rooftop slab aur 6 inch thickness ke liye cement calculation ka easy method! πŸ—οΈ

πŸ“ Slab Volume = 400 CFT
🧱 M20 Multiplier = 11.5
βš–οΈ Cement Bag = 50 KG
βœ… Approx. Cement = 92 Bags

Agar aap Civil Engineering, Construction aur Site Calculations se related useful tips seekhna chahte hain, to Follow karein aur is Reel ko Save zaroor karein. πŸ”₯

⚠️ Note: Actual cement quantity approved mix design aur site conditions ke mutabiq vary kar sakti hai.
✨

23/08/2026

Kya aap jante hain ke fresh concrete ka temperature kitna hona chahiye? 🌑️
Hot weather mein concrete pouring se pehle temperature check karna bohat zaroori hai. Zyada temperature ki wajah se slump loss, jaldi setting aur cracking ka risk barh sakta hai.
Is video mein jaaniye:
βœ… Concrete temperature kaise check karein
βœ… 32Β°C recommended limit ka kya matlab hai
βœ… High temperature concrete mein kya precautions lene chahiye
βœ… Concrete mein extra pani dalna kyun theek nahi
πŸ“Œ Note: Hamesha apne project specifications aur consultant ki approved requirements ko follow karein.
Construction aur Civil Engineering ki practical information ke liye Follow karein aur post Share karein. πŸ‘·β€β™‚οΈπŸ—οΈ
✨

Address

Street Gamy Wali
Dammam
31146

Alerts

Be the first to know and let us send you an email when Engineer Umar posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Engineer Umar:

Shortcuts

Share