11/12/2025
Starting Thursday, November 13, Building Solutions will close the southbound west lane at the intersection of 14th Avenue and Hennessey Street, as shown on the map below. During this time, the southbound traffic in this area will be reduced to one lane. This section of 14th Avenue is expected to reopen on Monday, November 17.
As you travel through the construction zone, please stay alert for construction equipment, loose or shifting soil, freshly placed concrete, tar sealant, and other potential hazards. Be mindful of your surroundings and follow all posted traffic control measures to ensure the safety of both motorists and construction crews. If you notice any unsafe conditions or issues that require attention, please contact Building Solutions at (620) 225-1199. Thank you for your patience and cooperation during this project.
—
A partir del Jueves 13 de Noviembre, Building Solutions cerrará el carril oeste en dirección sur en la intersección de la Avenida 14 y la Calle Hennessey, como se muestra en el mapa a continuación. Durante este tiempo, el tráfico en dirección sur en esta zona se reducirá a un solo carril. Se espera que esta sección de la Avenida 14 vuelva a abrirse el lunes 17 de Noviembre.
Al transitar por la zona de construcción, manténgase alerto ante el equipo de trabajo, el suelo suelto o en movimiento, el concreto recién colocado, el sellador de alquitrán y otros posibles peligros. Sea consciente de su entorno y siga todas las medidas de control de tráfico publicadas para garantizar la seguridad tanto de los automovilistas como de las cuadrillas de construcción. Si observa condiciones inseguras o problemas que requieran atención, comuníquese con Building Solutions al (620) 225-1199. Gracias por su paciencia y cooperación durante este proyecto.