05/29/2024
It’s been a while since the last studio build post. Life has thrown some curve balls lately, causing the build to be put on pause for over a month. Anyways, here’s the update!
With 200 fresh 2x4s additional bracing was added to the roof for peace of mind. Then framing of the interior studio walls began. So far the storage room and isolation booth walls have been framed. Next come the control room and the Live room. Then the addition of vibration absorbing framing brackets to tie it all together. That way a minimum 1” air gap between rooms can be maintained and to make everything sturdy! Now that the project is back on course, updates should be more consistent again!