01/08/2025
NOTICE OF POWER INTERRUPTION
Date: August 2, 2025/Saturday
Time: 6:30AM-11:30AM
Purpose/s: SCHEDULED LINE MAINTENANCE
1. Configuration of line in preparation for the energization of NPC 20MVA Substation (Tapping of Feeder 4 Bato Poblacion-Baras line section to Feeder 3 Tie-Line)
2. Installation of recloser at Sitio Balongbong, Sibacungan, Bato
3. ROW Clearing Activities
Affected Areas:
Due to unavailability of Emergency Power Supply Agreement (EPSA) Solong Diesel Power Plant, Solong Hydro Power Plant and Balongbong Hydro Power Plant during the said activity at Sitio Balongbong, Sibacungan, Bato, affected areas will experience power interruption.
Entire Municipality of Bato (except Marinawa)
Entire Municipality of Baras
Entire Municipality of Gigmoto
SAN MIGUEL: San Juan Aroyao (Grande), District 1, District 2, District 3, Solong, Boton
VIRAC: Portion of Sta. Cruz, Salvacion, San Jose, San Pedro, portion of San Roque near Virac Cathedral, San Pablo, San Juan, Concepcion, Balite, Cabihian, Hawan Ilaya, Hawan Grande, Balite, F. Tacorda Village, Buenavista, Calampong, Marilima, Batag, Palta Small, Palta Big, Palta Salvacion, Calabnigan, Sto. Cristo, Sto. Domingo
SAN ANDRES: Asgad, Codon, Bislig, Cabcab, Bagong Sirang, Catagbacan, San Vicente, Datag, Agojo, Tominawog, Alibuag, Comagaycay, Batong Paloway, Wagdas, Sapang Palay, Sta. Cruz, San Roque, Salvacion, Esperanza, Divino Rostro, Belmonte, Carangag, Bon-ot, Timbaan, Lictin, Yocti, Palawig, Rizal, San Jose
Power may be restored sooner or later than scheduled depending on the actual site situation. Please consider our lines always energized for precautionary measure. Thank you.