
18/06/2018
iHM decided the best way to cope with re-pack work on Mt Wilson was to build an entirely new transmitter site that could be used when work was going on at the normal site. Here's part 3 on how it all went together.
This is the third installment of a series documenting how iHeartMedia Los Angeles is being affected by the spectrum repack