07/13/2026
Today we did some destructive testing on a 1/2” 6x7 sandline. We occasionally preform breaks on sandline batches to ensure service and swab rig lines are preforming to spec. This one was pulled under load loaded with duplex sleeve ends until it finally separated.
This one held strong all the way to 24,600 lbs — coming in above spec. Have you ever had to shear sand line or accidentally parted?