DK Sharma Engineer

DK Sharma Engineer Civil Engineer | Site Work & Rebaring | YouTube: DK Sharma Engineer

27/08/2026

बॉक्स कल्वर्ट कंस्ट्रक्शन में कंक्रीटिंग से पहले 5 सबसे जरूरी जांच! 👷‍♂️

अगर ये 5 चेक नहीं किए तो पूरी Structure Fail हो सकती है! 😱
1️⃣ Steel Spacing & Cover
2️⃣ Shuttering Tightness
3️⃣ Safai - Kachra aur Pani
4️⃣ Lapping & Binding
5️⃣ Level & Dimension

Quality Check = Safe Structure ✅

Aap kaunsa check sabse important mante ho? Comment me batao 👇

Follow for Daily Site Knowledge! 🙏

Concreting Shuttering SteelWork CivilWork ConstructionTips IndianConstruction CivilSite ReelsIndia CivilEngineerLife

Site Work in Progress 🚧Culvert Box Bridge - Surface Repair & Finishing WorkQuality work is not just about concrete, it's...
27/08/2026

Site Work in Progress 🚧

Culvert Box Bridge - Surface Repair & Finishing Work

Quality work is not just about concrete, it's about commitment! 💪

26/08/2026

सिविल इंजीनियरिंग में सबसे महत्वपूर्ण घनत्व (Density) Chart! 👷‍♂️
PCC, RCC, Cement, Steel sab ka density ek hi photo me!
Save kar lo, Site aur Exam dono me kaam ayega!

Follow karo aisi hi जानकारी के लिए 👇
RCC Steel Cement AACBlock CivilEngineer SiteKnowledge

25/08/2026

With Marshall Becky – I just got recognized as one of their top fans! 🎉

25/08/2026

Kitne mm aur kaunsa SWG wire hai? 👇
YouTube pe to sabne dekh li, ab Insta walo ki baari!

Sahi jawab wale ka comment PIN 📌 hoga!

Bridge Grinding Work | Construction Site RealityBridge pe plaster ya waterproofing se pehle grinding karna bahut zaroori...
24/08/2026

Bridge Grinding Work | Construction Site Reality

Bridge pe plaster ya waterproofing se pehle grinding karna bahut zaroori hota hai.

Isse deewar ki extra concrete, laitance aur uneven surface nikal jata hai aur surface ekdum strong bonding ke liye ready ho jati hai.

Scaffolding par kaam karte samay Safety Helmet, Jacket aur Mask lagana must hai. 👷

Aapke site par grinding kaise karwate ho? Comment me batao.

Site Location: Bridge Area
Work: Surface Grinder se concrete wall grinding for better finish and waterproofing preparation..

23/08/2026

Hilti RE-500 se Sariya Fix karne ka Sahi Tarika! 👷‍♂️💪

60 Sec me 3 Sabse Important Step 👇
1️⃣ Gun Loading Trick - Hawa kaise nikale?
2️⃣ Pink Colour ka Secret - Kab rukna hai?
3️⃣ Injection ka Sahi Angle

Galat tarike se Chemical waste + Strength zero!

Full 3 Minute ki Detailed Video - YouTube par hai (Link in Bio) 🔗

Aap kaunsi Hilti use karte ho? Comment karo 👇

hilti hiltiRE500 chemicalanchoring civilconstruction sariya rebar indianconstruction siteknowledge

Bridge Abutment Wall Waterproofing Work in Progress! 🛠️Retaining wall par bituminous protective coating ka kaam chal rah...
21/08/2026

Bridge Abutment Wall Waterproofing Work in Progress! 🛠️

Retaining wall par bituminous protective coating ka kaam chal raha hai. Ye coating bridge ko paani aur nami se bachati hai aur uski life 2x badhati hai.

Quality work is our first priority! 💯

18/08/2026

TMT Sariya Guide - Diameter & Grade Pehchan Lo! 👷‍♂️
8mm se 32mm tak ka farak aur Sariya par likhe nishan ka matlab ab samjho! Mistri bhi nahi thag payega!

Har Ghar Banane Wale Ko Ye Jankari Honi Chahiye!
1. REBAR DIAMETERS: 8mm, 10mm - Chhoti chhat, Ring ke liye
12mm, 16mm - Beam, Column, Slab ke liye sabse zyada use hota hai
20mm, 25mm, 32mm - Badi Building, Foundation ke liye
2. REBAR MARKINGS (Sariya par kya likha hota hai): MARK H - Company ka Naam
MARK 11 - Diameter (jaise 11mm)
MARK S - Steel ka Grade
3. STEEL CLASSES: S = Carbon Steel
W = Low Alloy Steel (Sabse Strong, Earthquake Proof)

Ye Photo ko SAVE kar lo, kaam ayegi!

Aapko konsi sariya use karni hai comment karo!

Address

Faridabad
Faridabad
121004

Alerts

Be the first to know and let us send you an email when DK Sharma Engineer posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share