Indian RailRoad

Indian RailRoad I'm udit Mehta a traveler , Who loves to share videos and personal experience regarding Travelling

The vibrant Amul-liveried WAP-5  #30068 from Vadodara sheds With 19411 Gandhinagar Capital - Daulatpur Chowk Express Sta...
19/06/2025

The vibrant Amul-liveried WAP-5 #30068 from Vadodara sheds With 19411 Gandhinagar Capital - Daulatpur Chowk Express Standing at Marwar Jn

#30068

Kanpur Wap7  #37338 With 22548 Sabarmati - Gwalior SF Express Standing At Palanpur Station.                             ...
18/06/2025

Kanpur Wap7 #37338 With 22548 Sabarmati - Gwalior SF Express Standing At Palanpur Station.

"Glowing in the dark: The silent power of the loco that keeps India moving 🇮🇳✨          "                               ...
16/06/2025

"Glowing in the dark: The silent power of the loco that keeps India moving 🇮🇳✨ "

15/06/2025

Watch Aravali Express thunder past Palghar! ⚡ Skipping stations like a boss! 🚄

📸 Bgkt WDP-4D 40219 with 14707 Ranakpur Express Standing At Abu Road Station   #40219    #14707                         ...
08/06/2025

📸 Bgkt WDP-4D 40219 with 14707 Ranakpur Express Standing At Abu Road Station

#40219 #14707

🚆✨ Mumbai Metro Line 2A – A New Era of Connectivity Begins! ✨🚆The future of Mumbai’s transit is here! 🚀 Witness the gran...
10/03/2025

🚆✨ Mumbai Metro Line 2A – A New Era of Connectivity Begins! ✨🚆

The future of Mumbai’s transit is here! 🚀 Witness the grand arrival of the Mumbai Metro Line 2A rake at Dahanukarwadi Metro Station (1A)—a major step towards a faster, smoother, and more efficient commute for Mumbaikars! 🌆🏙️

This revolutionary metro line, stretching from Dahisar East to DN Nagar, is set to transform the way we travel—reducing congestion, cutting down travel time, and offering a seamless connection to the city’s bustling hubs. Whether you're a daily commuter, a traveler, or just a fan of Mumbai's ever-growing skyline, this is a moment to celebrate! 🎉

With modern design, advanced safety features, and world-class facilities, Metro Line 2A is not just a metro; it’s a symbol of progress! 🚄💙

Mumbai Metropolitan Region Development Authority- MMRDA
Maharashtra DGIPR

09/03/2025

The development of the 9,000 horsepower (HP) Co-Co electric freight locomotive by Indian Railways (IR) in collaboration with Siemens marks a significant advancement in India's rail transport capabilities. This initiative is part of a substantial contract awarded to Siemens Mobility, valued at approximately €3 billion, to design, manufacture, commission, and test 1,200 such locomotives over an eleven-year period, with a maintenance agreement extending for 35 years.

Key Features of the 9,000 HP Locomotive:

Power and Capacity: With a power output of 9,000 HP, these locomotives are among the most powerful freight locomotives globally. They are designed to haul loads of up to 4,500 tons at speeds reaching 120 km/h.

Advanced Technology: The locomotives will incorporate insulated gate bipolar transistor (IGBT) based propulsion technology, enhancing energy efficiency through regenerative braking systems.

Manufacturing and Maintenance: Assembly will occur at the Indian Railways factory in Dahod, Gujarat, with maintenance activities planned at four IR depots: Vishakhapatnam, Raipur, Kharagpur, and Pune.

Siemens Western Railway

Vande Bharat Express Resting at Ahmedabad Station 22961 Mumbai Central - Ahmedabad Vande Bharat Express Resting at Ahmed...
27/02/2025

Vande Bharat Express Resting at Ahmedabad Station

22961 Mumbai Central - Ahmedabad Vande Bharat Express Resting at Ahmedabad Jn After Completing its Duty

An Elevated Deck on Platform no.1 of length 45m and 10.4m wide with escalator on platform no. 1 & South FOB of 40m lengt...
11/12/2024

An Elevated Deck on Platform no.1 of length 45m and 10.4m wide with escalator on platform no. 1 & South FOB of 40m length and 10m width with 3 staircases on platform no 1, 2/3 & 4 have been commissioned at Kandivali station for the convenience of commuters.

𝐓𝐫𝐚𝐜𝐤 𝐋𝐚𝐲𝐢𝐧𝐠 𝐂𝐨𝐦𝐩𝐥𝐞𝐭𝐞𝐝 𝐁𝐞𝐭𝐰𝐞𝐞𝐧 𝐀𝐚𝐫𝐞𝐲 𝐚𝐧𝐝 𝐂𝐮𝐟𝐟𝐞𝐏𝐚𝐫𝐚𝐝𝐞The Mumbai Metro Rail Corporation (MMRC) has announced the completio...
10/12/2024

𝐓𝐫𝐚𝐜𝐤 𝐋𝐚𝐲𝐢𝐧𝐠 𝐂𝐨𝐦𝐩𝐥𝐞𝐭𝐞𝐝 𝐁𝐞𝐭𝐰𝐞𝐞𝐧 𝐀𝐚𝐫𝐞𝐲 𝐚𝐧𝐝 𝐂𝐮𝐟𝐟𝐞𝐏𝐚𝐫𝐚𝐝𝐞
The Mumbai Metro Rail Corporation (MMRC) has announced the completion of track-laying work on both the upline and downline sections of Mumbai Metro Line 3 between Aarey and Cuffe Parade.
Currently, the Mumbai Metro Line 3 is operational between Aarey and BKC sections.
The other portion of line 3 which spans from Bandra Kurla Complex (BKC) to Cuffe Parade is expected to be fully operational by May 2025

Olectra X2 buses of Gorai Depot operating on route A203 ( Borivali to Andheri Station station w).                       ...
10/12/2024

Olectra X2 buses of Gorai Depot operating on route A203 ( Borivali to Andheri Station station w).

⚡️

14701/2 Amrapur Aravali ExpressShri Ganganagar Junction --> BDTS/Mumbai Bandra Terminus                                 ...
10/12/2024

14701/2 Amrapur Aravali Express

Shri Ganganagar Junction --> BDTS/Mumbai Bandra Terminus

Address

Mumbai

Alerts

Be the first to know and let us send you an email when Indian RailRoad posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Indian RailRoad:

Share