01/10/2026
Delhi’s long-awaited Barapullah Elevated Road Phase 3 has been inaugurated by Union Home Minister Amit Shah, marking a major addition to the capital’s urban road infrastructure.
Built at a revised cost of ₹1,635 crore, the project provides a signal-free connection between Mayur Vihar Phase-I and Sarai Kale Khan, with onward connectivity towards AIIMS and South Delhi. The Phase 3 elevated corridor is around 3.5 km long and three lanes wide, with eight loops connecting the corridor at Sarai Kale Khan and Mayur Vihar.
The project was approved in 2014, with construction beginning in 2015. Originally targeted for completion in 2017, the project faced multiple delays and its cost was subsequently revised from ₹1,260 crore to around ₹1,635 crore.
Amit Shah Rekha Gupta MoRTH India NHAI