Amaking integrated services

Call Directions

Amaking integrated services I'm a skilled Developer,projects manager, REAL ESTATE Tycoon/Broker. (Structural/site Engineer) 🦺 ⛑️ πŸ˜οΈπŸ’πŸ—οΈπŸ­. we're always ready to add value to your Money.

WhatsApp: +2347064859614.

01/08/2026

17/07/2026

☁ πŸͺ‚ ✈ ☁ ☁
🏒__🏨_🏒🏬_🌴_🏠🏑🏠__πŸ₯🏫__
🌲 /πŸš–πŸš” \🌲🌴🌳🌲
🌴 / 🚘 πŸš– \🌳🌲🌲🌳
🚦 / πŸš”πŸš˜

17/07/2026



β€œYou Bought Land for ₦5 Million, Paid ₦350,000 for Survey and ₦500,000 for a Lawyer. Now You’re Charging Me for Drawings...
17/06/2026

β€œYou Bought Land for ₦5 Million, Paid ₦350,000 for Survey and ₦500,000 for a Lawyer. Now You’re Charging Me for Drawings?”

This is one of the funniest and most painful conversations many designers, architects, and engineers have with clients.

A client buys land for ₦5 million.

Pays ₦350,000 for a survey plan.

Pays ₦500,000 to a lawyer for documentation.

Then suddenly becomes angry when it is time to pay for architectural, structural, electrical, and mechanical drawings.

Some will even say:

β€œCan’t you just charge ₦50,000?”

β€œWhy should drawings cost this much?”

β€œIt’s just paper and printing.”

But let us be honest.

Are you paying for paper?

Or are you paying for knowledge, experience, calculations, responsibility, and professional expertise?

The truth is that a building drawing is one of the most important investments in the entire construction process.

Before a single line appears on that drawing, a lot of work has already gone into it.

The architect studies your requirements.

He develops floor plans.

He considers circulation spaces.

He checks room sizes.

He ensures functionality.

He produces elevations and sections.

He may revise the design several times before the client is satisfied.

The structural engineer comes in and begins another stage entirely.

He determines foundation requirements.

He calculates loads.

He sizes beams.

He designs columns.

He designs slabs.

He checks structural stability.

He ensures the building can safely carry loads throughout its lifespan.

The electrical designer plans:

Lighting points.

Socket outlets.

Distribution boards.

Cable routes.

Power requirements.

Safety considerations.

The mechanical designer plans:

Water supply systems.

Drainage systems.

Septic systems.

Overhead tanks.

Pumping systems.

And other building services.

Now let us talk about the expenses professionals face.

Most people see only the final drawing.

They do not see what happens behind the scenes.

Professional software subscriptions.

Laptops and computers.

Electricity bills.

Internet subscriptions.

Office rent.

Transportation to site.

Site inspections.

Printing costs.

Plotting costs.

Training and certifications.

Professional memberships.

Years of education.

Years of practical experience.

Continuous learning to stay updated with industry standards.

Many professionals spent four, five, or even six years in higher institutions.

Some spent additional years acquiring practical experience before becoming competent enough to design safely.

Yet some people expect all of that expertise to be sold for the price of a few bags of cement.

The irony is that the same client who negotiates drawings aggressively may later spend millions on imported tiles, luxury fittings, POP ceilings, and decorative finishes without asking for discounts.

The truth is this:

A mistake in your tiles can be replaced.

A mistake in your paint can be corrected.

A mistake in your furniture can be changed.

But a mistake in design can cost millions to rectify.

In some cases, it can even lead to structural failure.

That is why good drawings are not expensive.

Bad or incomplete drawings are expensive.

Because you eventually pay for the mistakes during construction.

The reality is that professional drawings save money.

They reduce wastage.

They improve planning.

They reduce errors.

They help contractors work efficiently.

They make approvals easier.

They protect your investment.

So when a professional gives you a fee for design services, understand that you are not paying for lines on paper.

You are paying for years of knowledge, technical expertise, responsibility, and the confidence that your project has been properly planned before construction begins.

Remember this:

Nobody complains when paying for land because they can see the land.

Nobody complains when paying for blocks because they can touch the blocks.

But the drawings are what transform that land and those blocks into a successful building.

Without proper drawings, construction becomes guesswork.

And guesswork is always more expensive than professional design.




13/06/2026

This is what happens when professional Engineers are excluded from a project. There is no such thing as a "small" building project when it comes to safety and quality. Stop cutting corners in construction, because there are no shortcuts to excellence. πŸš§πŸ—οΈ

Every structure carries lives, investments, and responsibilities. The cost of poor workmanship and inadequate supervision is often far greater than the cost of doing it right from the beginning.

Remember: Skilled Engineers are not cheap, and cheap Engineers are rarely skilled. Invest in competence, engage qualified professionals, and build with integrity.





12/06/2026




Calm and simple for a man who is trying to manage a budget πŸ’›πŸ The best gift you can gift your family is a home you know t...
10/06/2026

Calm and simple for a man who is trying to manage a budget πŸ’›πŸ 

The best gift you can gift your family is a home you know they are comfortable in πŸ’›πŸ™‡
WhatsApp : 07064859614



10/06/2026
6 Bedroom Penthouse Duplex Villa (Foundation to Parapet) Real Cost BreakdownFor those always asking me How much does it ...
10/06/2026

6 Bedroom Penthouse Duplex Villa (Foundation to Parapet) Real Cost Breakdown
For those always asking me How much does it cost to build this kind of duplex?

Here’s a real-life material estimate I used in building this standard 6-bedroom Penthouse duplex from foundation to parapet level πŸ‘‡

9,500 blocks
750 bags of cement
85 tons of chippings
17 trips of sharp sand
17 trips of red earth (filling)
80 lengths of 16mm
370 lengths of 12mm
90 lengths of 10mm
70 lengths of 8mm
4 rolls of binding wire
Boards:265 pcs (1x12)
250 pcs (2x2)
50 pcs (1x6)
25 pcs (1x9)
120 pcs (1x4)
280 pcs bamboo
3 bags (3-inch nails)
2 bags (2-inch nails)
5 bundles of pegs
5 shovels + head pans
5 paint bucket

πŸ‘·πŸ½β€β™‚οΈ LABOUR COST: This is where many people get it wrong…
Labour depends on:
Location
Complexity of design
Site conditions
Contractor experience

At this stage, you’ve completed about 85–90% of the structural work.
But don’t be deceived…
Finishing (roofing, electrical, plumbing, POP, tiles, painting) can consume the remaining budget fast.




Address

No9 Royce Road
Owerri

Telephone

+2347064859614

Website

Alerts

Be the first to know and let us send you an email when Amaking integrated services posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share