17/06/2026
Thierry programs the IR-module for the container crane stop so that the cars drive at the slowest speed when they start again - thus ensuring they can get through the minimum radius on the way out. After testing it, we install the two IR-leds at each end of the right crane track, making them almost invisible.
I start cutting and fitting the stone wall sheet on the side of the climbing main track that runs around the industrial area. 😀