Taylors Contracting Co Ltd.

Taylors Contracting Co Ltd. Civil and Earthmoving contractor with branches in Nelson and Christchurch

The Taylors Contracting team has been very busy helping to clear up windthrow to open up road access following the recen...
14/07/2025

The Taylors Contracting team has been very busy helping to clear up windthrow to open up road access following the recent weather events in Nelson Tasman. One of the key tools in our arsenal is our Terex CBI Magnum Force 6800CT Horizontal Grinder. The grinder can process more than 200 tonnes of residue per hour. Nelson Tasman Civil Defence

To read the full story and to see a video of the grinder at work go to https://taycon.co.nz/news-article/taylors-grinder-lends-its-impressive-power-to-recovery-efforts/

We have a role available for a Excavator/Multi-Skilled Operator.Please share the information about the role on the Taylo...
10/07/2025

We have a role available for a Excavator/Multi-Skilled Operator.
Please share the information about the role on the Taylors Contracting website at the link below with anyone you think might be a good fit:

Taylors is currently seeking an experienced excavator & multi-skilled operator to join our team! You’ll bring with you: Minimum of a class 2 driver’s

Our Terex CBI Magnum Force 6800CT Horizontal Grinder, working for  Downer NZ Ltd/Tasman District Council Road Maintenanc...
08/07/2025

Our Terex CBI Magnum Force 6800CT Horizontal Grinder, working for Downer NZ Ltd/Tasman District Council Road Maintenance Alliance helping with the clean up of flood debris along the Motueka River West Bank Road.

(The Alliance is a fully integrated, single delivery team, designed to provide better outcomes for community. This means the experts from TDC and Downer work together, helping to ensure the day to day decisions are the best they can be for the network and the region).

📷Matt Henderson/Dan Lane

Our teams have been busy over the weekend assisting Fulton Hogan with urgent repairs on State Highway infrastructure imp...
30/06/2025

Our teams have been busy over the weekend assisting Fulton Hogan with urgent repairs on State Highway infrastructure impacted by the Motupiko River overtopping its banks.
Our initial response includes reinforcing high risk locations ahead of further potential weather impacts. Our teams are also engaged across various river sites, focusing on debris removal, reinstating access roads and assessing damage.

Our second season of rock export to Wellington from Port Tarakohe  started on Monday 23 June with the first 1100 tonne l...
24/06/2025

Our second season of rock export to Wellington from Port Tarakohe started on Monday 23 June with the first 1100 tonne loaded on board "Geronimo" departing Tarakohe at dusk. A slow trip across the Cook Strait at four knots!

A walk down memory lane back to 1987 when Taylors had a contract to put a 200-metre pipeline under the Maitai River, a t...
09/06/2025

A walk down memory lane back to 1987 when Taylors had a contract to put a 200-metre pipeline under the Maitai River, a tricky job that was very dependent on tide. The pipes were 4-6 metre lengths made of steel, lined with concrete and wrapped with rubber, and they were welded together to form the pipeline. At low tide a trench was dug across the river and a line-up of excavators used to lift the pipes into place. The final join had to be made virtually in the water at dead low tide so a bund was built and the water pumped out while Alan Skilton was in there welding, the combination of high energy electricity and saltwater making the job particularly complicated.

The Taylors Way, Carol Dawber, Published August 2021, Available by contacting Taylors Contracting, 03 542 3150.

The Quarry team are at the Branch River to crush some AP30 Maintenance Metal for use on Marlborough District Council gra...
03/06/2025

The Quarry team are at the Branch River to crush some AP30 Maintenance Metal for use on Marlborough District Council gravel roads. Great to be working with T C Nicholls again.

Emergency works for Nelson City Council, working alongside Nelmac to repair compromised stop banks at Clouston Terrace a...
27/05/2025

Emergency works for Nelson City Council, working alongside Nelmac to repair compromised stop banks at Clouston Terrace and Riverside Pool prior to forecast rain events.

We have a role available for a Construction Supervisor in Wellington.Please share the information about the role on the ...
19/05/2025

We have a role available for a Construction Supervisor in Wellington.
Please share the information about the role on the Taylors Contracting website at the link below with anyone you think might be a good fit:

Description Taylors have secured significant work in Wellington and are on the lookout for a new Construction Supervisor to join our team. Beyond this

It was a momentous day yesterday with the release of kiwi pukupuku into the Brook Waimārama Sanctuary, the first time ki...
07/05/2025

It was a momentous day yesterday with the release of kiwi pukupuku into the Brook Waimārama Sanctuary, the first time kiwi pukupuku have been in this area for nearly 100 years. This is the culmination of a lot of work by many, many people. We are proud to support the Brook Waimārama Sanctuary as part of its business club. Well done to everyone involved.

There are hopes the kiwi will thrive outside a sanctuary similar to what has unfolded in Wellington.

Our Civil team loves being able to put the finishing touches on a project, especially one that has spanned many years an...
23/04/2025

Our Civil team loves being able to put the finishing touches on a project, especially one that has spanned many years and different stages. The Taylors Civil team recently completed construction of a cycle bridge and pathways in the Borck Creek subdivision, much to the delight of the many locals who enjoy walking or cycling through this new development.

Well done to the team, who often work in the public eye while managing environmental controls (in this case water, mud and dust) and restricting public access during construction.

(Thelin Construction made and installed the concrete bridge deck).

Address

Brightwater

Opening Hours

Monday 8am - 5pm
Tuesday 8am - 5pm
Wednesday 8am - 5pm
Thursday 8am - 5pm
Friday 8am - 4pm

Telephone

+6435423150

Alerts

Be the first to know and let us send you an email when Taylors Contracting Co Ltd. posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share