Metro MEPF Solutions

Metro MEPF Solutions Reliable. Integrated.
📍 Serving Clients with Precision & Innovation. We sell quality and guaranteed best value home for everyone.

🔧 MetroMEPF Solutions | Engineering the Future of Building Services
Experts in Mechanical, Electrical, Plumbing & Fire Protection Design and Consultancy.
💡 Smart.

15/11/2025

Now Hiring
Installers for Solar projects.

Project Turnover🧱 Warm & Appreciative VersionAnother milestone achieved! 🎉Today, we proudly handed over to our client.We...
13/11/2025

Project Turnover
🧱 Warm & Appreciative Version

Another milestone achieved! 🎉
Today, we proudly handed over to our client.

We’re grateful for the trust and collaboration that made this project a success. Kudos to our hardworking team for their commitment to quality and timely delivery.

On to the next one! 💪

"MEP Standards Simplified: Which Codes Apply to HVAC, Fire, and Plumbing Systems".In every MEP project, one of the bigge...
09/11/2025

"MEP Standards Simplified: Which Codes Apply to HVAC, Fire, and Plumbing Systems".

In every MEP project, one of the biggest challenges is knowing which standards apply to each service. Following the right code ensures safety, performance, and compliance — and helps avoid costly rework later.
Here’s a quick breakdown 👇

🌫️ HVAC Systems:
🔸1.ASHRAE – Design, ventilation, comfort & energy efficiency (ASHRAE 55, 62.1, 90.1)
🔸 SMACNA – Duct fabrication & installation standards
🔸 AMCA / AHRI – Fan and equipment performance ratings
🔸 SBC 601 – Local mechanical and energy efficiency code

🔥 Firefighting Systems:
🔸 NFPA 13, 14, 20, 25, 72 – Fire pumps, sprinklers, standpipes & alarms
🔸 UL / FM – Certified materials and fire-rated equipment
🔸 SBC 801 – Local fire safety and life protection standard

🌊 Potable Water Systems
🔸 IPC / UPC – Design and layout of water supply & fixtures
🔸 ASME A112 – Plumbing fittings & valves
🔸 ASTM – Material testing for pipes and fittings
🔸 SBC 701 – Local water system and plumbing compliance

🚿 Sanitary & Drainage Systems:
🔸 IPC / UPC – Drainage, venting & hygiene control
🔸 ASTM D3034 / D2665 – Pipe materials & testing
🔸 ASME A112.6.3 – Floor drain standards
🔸 SBC 702 – Local sanitary and stormwater guidelines

Each code plays its part — when applied together, they ensure our systems are safe, efficient, and ready for approval.

Which standard do you find the most challenging to

follow on-site — ASHRAE, NFPA, or SBC?

Follow our page for more info.

Or contact is if you have requirements for Design or Installation.

It’s officially **Day 1 of Philconstruct Expo 2025!** 🎉  We’re excited to be part of the country’s biggest construction ...
06/11/2025

It’s officially **Day 1 of Philconstruct Expo 2025!** 🎉

We’re excited to be part of the country’s biggest construction and building technology event — a great place to explore the latest trends, innovations, and sustainable solutions in the industry. 🏗️🌿

Looking forward to connecting with industry partners, suppliers, and fellow professionals throughout the expo. See you there! 👷‍♂️👷‍♀️

VRF system installation we got you covered.
30/10/2025

VRF system installation we got you covered.

Ducting and Mechanical works.Let us know your requirements.
30/10/2025

Ducting and Mechanical works.

Let us know your requirements.

21/10/2025

Q: MEPFS problem?
A: Aldteo is the Solution..

21/10/2025

💡 Why Choose US ..

When it comes to Mechanical, Electrical, Plumbing, Fire Protection, and Sanitary works — credibility matters.
Hiring an SEC-registered contractor means your project is handled by a legitimate, accountable, and qualified company.

✅ Legally recognized and compliant with national standards
✅ Backed by licensed engineers and skilled professionals
✅ Provides warranties and full accountability
✅ Financially stable and project-ready
✅ Trusted by clients and developers

With an SEC-registered MEPFS team, you gain peace of mind, quality assurance, and long-term reliability.

🔧 Choose safety. Choose professionalism. Choose Aldteo.

On going deep cleaning before turn over to Client..
21/10/2025

On going deep cleaning before turn over to Client..

📍Project Update: One Ayala | Near CompletionWe’re proud to share that our HVAC and Kitchen Exhaust System Installation a...
20/10/2025

📍Project Update: One Ayala | Near Completion
We’re proud to share that our HVAC and Kitchen Exhaust System Installation at the One Ayala Project is now nearing completion! 💨🏗️

Our team continues to deliver high-quality workmanship and efficient mechanical solutions to ensure optimal comfort and safety for the space.

👏 Kudos to our engineers, technicians, and partners for their dedication and expertise in bringing this project to life.

Address

J Felipe Street , Chrysanthemum Village, San Pedro City, Laguna
Binãn

Alerts

Be the first to know and let us send you an email when Metro MEPF Solutions posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Metro MEPF Solutions:

Share