21/04/2025
Issue kay Adiong that VPISD is endorsing candidates. Issue sa kanya that VPISD is pushing back.
Of course worried ka Zia because MMA Achiever and Construction Development is thriving under the BBM-Led government. Biruin mo yun, since BBM became the President until Dec 2024, ang total project bagged by MMA is at Php 1,921,055,620.46.
Samantalang nung 2018, you had to explain to PCIJ how you lawfully took two Marawi road projects, one worth P12.5 million and the other P69.4 million, no? Hirap nun no? please see:
https://www.abs-cbn.com/focus/05/25/18/firms-of-clans-among-winners-of-marawi-road-housing-deals
Kaya I understand why you wouldn't like VPISD's pushback. 😉
In 2024 alone, Contracts of MMA Achiever and Construction Development totals 760,665,528.89, to wit:
1. WIDENING OF PERMANENT BRIDGES, BALATIN BR. (B02083MN) ALONG BUKIDNON BDRY-NORTH COTABATO RD (bridge) Contract ID: 24K00447 Cost: 124,185,383.38
2. CONSTRUCTION OF GANASSI-TUBOD ROAD, MADAMBA SECTION, LANAO DEL SUR (road) Contract ID: 24K00251 Cost: 94,576,711.06
3. REPLACEMENT OF PERMANENT WEAK BRIDGES, MALADI BR. (B02098MN) ALONG COTABATO-MALABANG-LANAO DEL NORTE RD (bridge) Contract ID:24K00396 Cost: 85,967,144.18
4. RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES, MATLING BR. (B02097MN) ALONG COTABATO-MALABANG-LANAO DEL NORTE RD (bridge)
Contract ID: 24K00397 Cost: 66,578,359.74
5. CONSTRUCTION OF BALATIN RIVER FLOOD CONTROL (BALATIN BRIDGE), WAO, LANAO DEL SUR (flood) Contract ID: 24K00118 Cost: 58,107,288.17
6. CONST. OF FLOOD MITIGATION STRUCTURE AT BARA-AS RIVER, PICONG, LANAO DEL SUR (flood) Contract ID: 24K00004 Cost: 57,905,789.81
7. ROAD WIDENING-SECONDARY ROADS-BUKIDNON BDRY-NORTH COTABATO RD - K1604 + (-1104) - K1604 + 145, K1608 + 503 - K1609 + 503 (road) Contract ID: 24K00451 Cost: 57,441,973.16
8. ROAD WIDENING-TERTIARY ROADS MULONDO-WAO ROAD-(S01604MN) CHAINAGE 40-CHAINAGE 2040 (road) Contract ID 24K00088 Cost: 47,766,832.23
9. CONSTRUCTION OF FLOOD CONTROL STRUCTURE, MADALUM, LANAO DEL SUR (flood) Contract ID: 24K00163 Cost: 47,766,245.67
10. CONCRETING OF GANASSI-TUBOD ROAD IN MADAMBA SECTION, LANAO DEL SUR (road) Contract ID: 24K00157 Cost: 47,765,597.45
11. CONSTRUCTION OF GATA RIVER FLOOD CONTROL WITH SLOPE PROTECTION, BRGY. CAIRAN, ROGAN, POONA BAYABAO, LANAO DEL SUR (flood) Contract ID 24K00378 Cost: 32,479,506.40
12. REHAB./RECONST.OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE-TERTIARY ROADS- MULONDO-WAO RD - (S01604MN) CHAINAGE 8600 - CHAINAGE 8800 (road) Contract ID 24K00423 Cost: 28,660,497.81
13. ASSET PRESERVATION- REHAB./RECONST./UPGRADING OF DAMAGED PAVED ROADS-PRIMARY ROADS, ILIGAN CITY-MARAWI CITY RD-(S01709MN) CHAINAGE 0 - CHAINAGE 268 (road) Contract ID: 24K00139 Cost 11,464,199.83
Business is good ba with BBM and Martin?
CTTO: Joie De Vivre Every Other Day (Joie Cruz)