MEP Techniques

MEP Techniques Welcome to MEP TECHNIQUES! Innovative Mechanical, Electrical, and Plumbing solutions.
(4)

⚡ Earthing Systems: The Silent Guardians of Electrical SafetyEvery reliable electrical system rests on a well-engineered...
28/04/2025

⚡ Earthing Systems: The Silent Guardians of Electrical Safety

Every reliable electrical system rests on a well-engineered earthing network. Whether you’re in power distribution, telecom, or building services — earthing saves lives and protects equipment.

1️⃣ What Is Earthing?

Earthing (or grounding) is the process of connecting non-current carrying parts of electrical systems to the earth’s mass — ensuring that any leakage current or fault current safely dissipates into the ground.

2️⃣ Objectives of Earthing

✅ Safety: Prevent electric shock by discharging fault current
✅ Stability: Maintain known voltage levels across equipment
✅ Protection: Prevent fire, insulation failure, and equipment damage
✅ Lightning & Static Discharge: Safely guide high-energy surges to earth
✅ System Reference: Provide stable ground for sensitive electronics

3️⃣ Qualities of Good Earthing

• 🟢 Low electrical resistance
• 🟠 High fault-current dissipation capacity
• 🔵 Corrosion-resistant over time
• ⚙️ Minimal maintenance & seasonal variation

4️⃣ Earthing Methods

🪨 Conventional Earthing
• Uses GI or copper plates, pipes, charcoal, and salt
• Requires watering for effectiveness
• Types:
• Plate Earthing
• Pipe Earthing
• Rod Earthing
• Strip/Wire Earthing

🆕 Maintenance-Free Earthing
• Prefilled compounds, copper-bonded rods
• Stable earth resistance year-round
• Zero maintenance & longer life

5️⃣ Resistance Standards (as per application)

• 🏭 Power Stations → ≤ 0.5 Ω
• 🏗️ Substations → ≤ 1.0 Ω
• ⚙️ Machines/Equipment → ≤ 0.5 Ω
• 🗼 Lattice Towers → ≤ 3.0 Ω
(Note: Resistance depends on soil moisture, compaction & temperature)

6️⃣ Installation Thumb Rules

🔩 Plate Earthing:
• Copper/GI plate min 3 m deep
• Surrounded by alternate layers of charcoal & salt
• Copper wire connection with bolts & washers

🛢️ Pipe Earthing:
• GI pipe (38 mm dia, 2+ m deep)
• Pit filled with salt + charcoal mixture
• Water poured seasonally to maintain conductivity

🪛 Rod/Strip Earthing:
• Multiple rods driven vertically or strips buried horizontally
• Used in rocky or sandy soil where deep pits are impractical

7️⃣ Earth Electrode Resistance = R₁ + R₂ + R₃

• R₁: Resistance of electrode
• R₂: Contact resistance between soil and electrode
• R₃: Soil resistance around the pit

Lowering any of these improves the system performance.

🔎 Final Thought

A circuit is never safe without proper grounding.
Neglecting earthing design is a gamble with human life and operational reliability.

Discover the power of WebCTRL, a cutting-edge building automation system that helps optimize energy efficiency, reduce c...
27/04/2025

Discover the power of WebCTRL, a cutting-edge building automation system that helps optimize energy efficiency, reduce costs, and enhance occupant comfort. Learn how WebCTRL's advanced features and capabilities can transform building operations and improve overall performance.

Discover the power of WebCTRL, a cutting-edge building automation system that helps optimize energy efficiency, reduce costs, and enhance occupant comfort. L...

Calibrating a pressure transmitter ensures accurate and reliable pressure readings. Here's a general step-by-step guide ...
23/04/2025

Calibrating a pressure transmitter ensures accurate and reliable pressure readings. Here's a general step-by-step guide to calibrate a pressure transmitter:

Tools Required:

Pressure calibrator or hand pump with a reference gauge

Multimeter (if needed for mA signal check)

Power supply (typically 24 VDC)

HART communicator (for smart transmitters)

Tubing and fittings

General Calibration Steps:

1. Isolate the Transmitter

Ensure the transmitter is isolated from the process (depressurized).

Close block valves, open vent valve to atmospheric pressure.

2. Connect Calibration Equipment

Connect pressure source to transmitter.

Connect the transmitter output to the multimeter (for mA check) or HART communicator.

Supply 24 VDC power if needed.

3. Zero Check

Apply 0% input pressure (usually atmospheric).

The output should read 4 mA or 0% depending on the signal type.

If not, perform zero trim using the HART communicator or manually adjust.

4. Apply Span Pressure

Apply 100% of the range (e.g., if 0-10 bar, apply 10 bar).

The output should be 20 mA or 100%.

If needed, perform span adjustment.

5. Apply Intermediate Points

Apply 25%, 50%, 75% and record the readings.

Check for linearity and accuracy.

6. Adjust and Trim

Use the HART communicator (or buttons on the transmitter) to fine-tune zero and span.

Document As Found and As Left values.

7. Reconnect to Process

Remove test equipment.

Close vent valve and open process valves.

Mounting heights of wiring devices are detailed in the electrical plans. While the architect can determine the mounting ...
10/04/2025

Mounting heights of wiring devices are detailed in the electrical plans. While the architect can determine the mounting heights, the Philippine Electrical Code (PEC) also provided the following standards:

Local Switch - ±1400 mm above floor finish level

Receptacles - ±300 mm above floor finish level and ±170 mm above the countertop

Convenience/Telephone Outlets - ±300 mm above floor finish

Desk Top Convenience Outlet - ±300 mm above working counter

Chime & Fire Alarm Bell - 250 mm below the ceiling


04/11/2024

Start fixing EMT box

27/10/2024

Curious about how we ensure top performance at the KAFD project? 🔍 Watch as we replace the VFD controller to boost efficiency and reliability! Join us on this journey and share this reel to spread the knowledge!

31/12/2023

Happy New Year Everyone!

Standard Mounting Height Details of utility box.
19/11/2023

Standard Mounting Height Details of utility box.

05/10/2023

Home automation

Loxone automation
05/10/2023

Loxone automation

My Project in refrigeration and cooling in Panda Khamis Mushaiyt.
15/09/2023

My Project in refrigeration and cooling in Panda Khamis Mushaiyt.

Libreng pabahay lipat agad.  lemited lang.defective: walang hagdan at elevator😂
05/07/2023

Libreng pabahay lipat agad. lemited lang.

defective: walang hagdan at elevator😂

Civil Engineers perform wonders / miracles,but are hardly acknowledged & praised by the society 🙁

Address

Jeddah

Telephone

+966576920912

Website

https://meptechniques.blogspot.com/

Alerts

Be the first to know and let us send you an email when MEP Techniques posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to MEP Techniques:

Share