11/17/2025
Rough grading is underway at the development site for The Wave at Dana Point hotel on the Headlands. Details at danapointtimes.com/eye-on-dp/site-preparation-begins-for-wave-hotel-construction-on-the-headlands/article_0e3f329e-5c9a-45d6-9709-fd56483498e7.html.