09/18/2025
US 285 in Villa Grove
― Highway Maintenance Alert ―
CDOT to perform surface treatment on US 285 in Villa Grove
Motorists can expect brief delays September 22 to 25
South-Central Colorado— Beginning Monday, September 22, the Colorado Department of Transportation will perform surface treatment operations on US Highway 285 between Saguache and Poncha Springs. The four day paving operations will take place Monday through Thursday between 6:30 a.m. and 5 p.m. Motorists will encounter full stops, alternating traffic, and 15 to 20 delays while crews make repairs to the concrete road surface in Villa Grove (Mile Point 104).
All work is weather-dependent. Motorists are encouraged to check the most current traffic impacts on COtrip.org.
Traffic Impacts
Monday through Thursday daytime work hours range from 6:30 a.m. to 5 p.m. Traffic impacts include:
Motorists should plan for 15 to 20 minute delays and should allow for extra travel time
Expect full stops and alternating traffic guided by flagging personnel
Watch for flaggers and signage signaling lane shifts and lane closures
Colorado Department of Transportation Maintenance Alert Map of US 285 paving operations in Villa Grove September 22 to 25 from 6:30 a.m. to 5 p.m. each day.
Colorado Department of Transportation Maintenance Alert Map of US 285 paving operations in Villa Grove September 22 to 25 from 6:30 a.m. to 5 p.m. each day.