12/16/2021
Great news from our friends at Caberfae Peaks!
Making moves!
The rumors are true: New Chairlift in 2022!
Caberfae Peaks has announced plans to install a new chairlift in 2022. The new lift will be supplied by Doppelmayr USA, based in Salt Lake City, Utah. The fixed grip triple chair is set to be delivered in the spring of 2022, with construction taking place summer of 2022, for service starting the 2022/2023 winter season.
The new "East Peak Triple Chair" will replace the Shelter Double Chair as the main base area lift and have a modified alignment, serving the full vertical and the new East Peak. The chair will serve beginner and intermediate terrain as well as the new ski trail, Funnel Cake, which was added for the 2021/2022 winter.
The new lift has been in the works for several years as a contract was signed back in September of 2020. To welcome the new chair, we have updated our trail Map which shows the line of the future lift. See the link below for a full size view:
https://caberfaepeaks.com/wp-content/uploads/2021/12/CABERFAE-PEAKS-TrailMap-2022.pdf