06/08/2026
Work On New Bridge To Resume Access To Almota Grain Terminal On Snake River Running Behind Schedule
COLFAX, WA – Work to replace the bridge to the Almota grain terminal on the Snake River South of Colfax is running a couple weeks behind.
COLFAX, WA – Work to replace the bridge to the Almota grain terminal on the Snake River South of Colfax is running a couple weeks behind. The Washington State Department of Transportation initially hoped to have the