
07/11/2025
Finally have a few days to take Studio F down to do some work. After exhaustive testing and loads of client feedback, we decided to make some acoustic adjustments.
We’re actually relocating the control room acoustic door and frame by about 10” as well as making some modifications to the diffusers.
Monitoring and Technical component changes as well bathroom and lounge renovation coming down the pike too!