10/28/2025
What was once a longtime surface parking lot will soon be home to a seven-story mixed-use building with 157 apartments, retail space, and parking. We first covered this site back in 2018 — and after several redesigns and a developer switch, Alterra Group has officially broken ground. Completion is expected in 2027.
Full story and renderings at the link in our bio.