Portal Arena Studios

Portal Arena Studios Production design

02/02/2022
Progress on set design and construction.
11/25/2020

Progress on set design and construction.

Progress report. Up next, stair case and small arch bridge. Maybe. I'm still not quite sure what to do with the top, but...
07/06/2015

Progress report. Up next, stair case and small arch bridge. Maybe. I'm still not quite sure what to do with the top, but there will be lots of market crowding possibilities

Docks and market progress on floating island.
07/03/2015

Docks and market progress on floating island.

Pillars thus far. I applied insulation foam onto pvc pipe and couch foam material for the ends. One coat black spray pai...
06/30/2015

Pillars thus far. I applied insulation foam onto pvc pipe and couch foam material for the ends. One coat black spray paint, light second coat was brown acrylic spray paint. I wanted extra spray foam to see if I can sculpt out a few jagged balance looks, as if the wind blows and the top might fall off. I went ahead with the paint to check durability and interaction with the ever so spongy couch foam material. I like the results. The exterior can take a beating if someone bumps into and causes a domino affect. Bounces right back.

I know it's been a while. I've been. . .   exploring.
05/17/2015

I know it's been a while. I've been. . . exploring.

04/19/2015
This lighting stuff is a blast!
04/07/2015

This lighting stuff is a blast!

Be careful which portal you retreat to
04/07/2015

Be careful which portal you retreat to

No.  It's not a disco. It's  cave river light test time
03/24/2015

No. It's not a disco. It's cave river light test time

. . .
02/27/2015

. . .

Address

Richmond, VA

Website

Alerts

Be the first to know and let us send you an email when Portal Arena Studios posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Portal Arena Studios:

Share