12/21/2025
Here is last week progress report on 6342. I replaced all of the coolant lines on the engine and transmission assembly, heater core assembly and defroster. Every connection is now new silicone hose. New rear leveling valves installed, new sealco relay valve for the brakes and I'm waiting on the new rear brake lines. Hopefully pick them up on Monday. Engine and transmission assembly have been steam cleaned. The engine compartment has been completely repainted back to factory spec. Engine and transmission also got a fresh coat of Alpine green. This next couple of days I really need to get this project wrapped up. I'm hoping by Christmas it will be completely operational and ready for the next phase. I still need to do the new rear airbags. What is on 6342 now have not been changed since 1999 when I did them last. At that point it will have all new front and rear suspension, engine / transmission, complete exterior rehab and interior repaint