10/09/2026
Mastering those Monday Moments✍️ - 3 August 2026
After working through the morning and afternoon, I was able to complete my first section of the Radnor Landfill Site.
As I've mentioned before, I enjoy seeing the extruded sections so it can be represented appropriately.
Our first submission is due tomorrow along with another two sections.
A great surprise was when my lecturer mentioned a few changes to the submission. I have to admit that I was a bit anxious because I thought I may have to change my entire drawing. In actual fact, there are merely additions to what I have already done.
Those additions include:
✅Hatch patterns of the existing soil.
✅Dashed lines from the x-axis connecting to the soil profile.
✅Contour interval points to be added to each contour interval.
I look forward to completing the rest of the soil sections and showing you the results.
Make sure to keep up with the next post.🚀