09/19/2025
We had the honor of working with BMA Media Group to celebrate 125 years of IBEW 103! You only get one chance to celebrate these milestones, and understood exactly what they needed.
The Breakdown:
First we needed to build a plan with 3D renders, months of communication and site visits. Then we loaded up trucks in Cleveland, boarded planes and shipped our crew out to Massachusetts to bring the vision to life!
The Specs:
Rigging:
• 250,000lb of flown equipment
• 5,406ft of truss
• 292 one-ton motors
Lighting & Control:
• 30,062 parameters
• 1,086 fixtures patched
Controlled by:
(2) GrandMA3 Full
(2) GrandMA3 Light
(3) GrandMA3 Processing Unit L
(1) GrandMA3 Processing Unit M
(MA Lighting International)
Power Distribution:
• 2,242 amps/leg across 18 services
• 22,625ft of multi cable
Audio Coverage:
• 12 hangs covering 300,000 sq/ft
Gear:
(32) L-Acoustics K2
(70) KARA II
(8) SB18
(16) KS28
(48) LA-12X Amplifiers
(L-Acoustics)
With all of our gratitude, we thank everyone involved in creating this specular event. Without the dedication of our team, the shared passion of event production with local AV professionals, and the drive to celebrate these milestones, none of this would have happened. Hats off to all the hands and minds involved in creating this one of a kind experience!